EBT Sideling Hill Tunnel (Fairview, PA)
East Broad Top Railroad's Sideling Hill Tunnel (1874-1956)
originally Moreland's Gap Tunnel
Fairview, Pennsylvania
This 830-foot tunnel was built by the coal-hauling East Broad Top Railroad in 1873-74. The tunnel is curved at both ends as it stands in the center of a 17 degree horseshoe curve under Sideling Hill. The north end (geographic east) was upgraded circa 1919 including a concrete portal with roll-up door to reduce winds and avoid icy rails. The tunnel served the life of the EBT through abandonment in 1956. It has since suffered several cave-ins, and water flowing the length of the tunnel exits the north portal. Most of the original EBT right-of-way remains in varying states of decay, while a tourist train operates north from Orbisonia over four miles of track.
Note: This text and accompanying photos are the copyright of Christopher Muller and may not be reproduced in whole or in part on any website, message board, or other medium.
Read Moreoriginally Moreland's Gap Tunnel
Fairview, Pennsylvania
This 830-foot tunnel was built by the coal-hauling East Broad Top Railroad in 1873-74. The tunnel is curved at both ends as it stands in the center of a 17 degree horseshoe curve under Sideling Hill. The north end (geographic east) was upgraded circa 1919 including a concrete portal with roll-up door to reduce winds and avoid icy rails. The tunnel served the life of the EBT through abandonment in 1956. It has since suffered several cave-ins, and water flowing the length of the tunnel exits the north portal. Most of the original EBT right-of-way remains in varying states of decay, while a tourist train operates north from Orbisonia over four miles of track.
Note: This text and accompanying photos are the copyright of Christopher Muller and may not be reproduced in whole or in part on any website, message board, or other medium.
© Copyright 2005-2023 Christopher Muller